15% on fly repellent products with the code : SUMMER-FLY15
La sellerie de Maé
Summer Deals
Stable
Dogs
Customer service in France Secure payment Easy returns

Adding to cart...

loading logo

Cart subtotal

View my cart
Loading...

I-DOG Canicross long lead Cani-Bike Opale

Discover the perfect leash for canicross with IDOG's OPALE leash, resistant and suitable for competition.

Canicross long lead I-DOG Cani-Bike Opale thumbnail
Starting at
€41.11
+€2.06 offered on your next order Credited after your order is confirmed
Description

The strength and performance of the OPALE lanyard are perfectly matched to competition use, which demands optimum material qualities. The OPALE lanyard has been designed with two criteria in mind, in order to select the type of lanyard to be used: the dog's weight and pulling strength.

The ALM range was designed in collaboration between I-DOG and Antony Le Moigne. Antony Le Moigne is a two-time champion world canicross champion and multiple champion winner in Europe and at France. He is the brand's ambassador.

General specifications :

  • 2 references depending on the dog's weight and pulling strength.
  • Long version for use in canivtt, canitrotinette or skijoering.
  • Maximum length: 240 cm.
  • Lightweight ultra carabiner: Fitted with a lightweight (2 g) ultra carabiner with safety locking system.
  • Handle: This leash has a handle on the carabiner side to hold your dog as close as possible to you, especially when starting out in competitions.
  • Shock absorber/knot: The lanyard's knots contain an elastic part that acts as a shock absorber, and a strap that encloses it. If the knot comes undone, the lanyard no longer has the elasticity oforigine. You need to slide the elastic back into the webbing and retie the knot where it wasorigine.
  • Spring matched to type of pull.
  • Non-metallic attachment ring.
  • Loop for attaching to the stem of a bicycle or scooter. The loop measures 15 cm in diameter and is made from the strap of the lanyard.
Additional information
BrandI-DOG
Colorblue
ColorBlue
Loading...
Loading...